Table 1.5: Meetings of Safety Committees              The Safety Status of Operating NPPs and Research

                                                   No. of     Reactors is described below:
         Name of the Committee / Expert Group
                                                  Meetings    (i)  Rajasthan Atomic Power Station (RAPS-1&2)
         SARCOP                                      17
         LWR Safety Committee                         8           RAPS-1&2 underwent Periodic  Safety  Review
         (TAPS-1&2 & KK-1&2)                                  (PSR) as a pre-requisite for renewal  of its operating
                                                              licence beyond August 2019.  Station had submitted
         PHWR Safety Committee -1
         (RAPS-1&2, MAPS-1&2, NAPS & KAPS-           18       applications for renewal of licence under the Factories
         1&2)                                                 Act, 1948 and authorization  for radioactive  waste
                                                              disposal/transfer. Based on the outcome of the PSR, the
         PHWR Safety Committee-2                              licence was extended up to August 31, 2024.
         (KGS-1&2, KGS-3&4, RAPS-3&4 & RAPS-          8
         5&6)                                                     The applications were reviewed by AERB following
         PHWR Safety Committee -3                     6       multi-tier review process. Review assessment indicated
         (TAPS-3&4)                                           that the performance of RAPS-2 w.r.t.  nuclear,
         IGCAR Safety Committee                       6       radiological and industrial safety had been satisfactory.
         (RR, CORAL, FRTG, RML &RCL)                          The results of In-Service Inspections (ISI) were found to
         Standing Committee on Reactor Physics       16       be satisfactory and plant is capable for safe operation
         (SC-RP)                                              for  next  five years.  Based on the review,  station has
                                                              planned to replace boiler hairpins. Radioactive effluent
         Standing Committee on Control,
         Instrumentation & Computer Based Systems     6       discharges remained  well below the limits specified
         (SCCI & CS)                                          in technical specification. Effective dose to member
                                                              of public  residing  at exclusion  zone  was well  within
         Expert Group on Equipment Qualification      2
         (EG-EQ)                                              the limit prescribed by AERB (Refer chapter 4 of this
                                                              report). Station possesses technical  & administrative
         Expert Group on Coolant Channels (EGCC)      9       capability  for safe operation  of the plant. Station has
         Total                                       96       well-established programme for utilization of operating