SAFETY SURVEILLANCE OF NUCLEAR
           01          FACILITIES









        1.1  SAFETY REVIEW MECHANISM OF NUCLEAR               and requirements. AERB has established a regulatory
             FACILITIES                                       framework,  which  involves  stipulating  the  safety
                                                              requirements, issuance of regulatory consents after
            Nuclear facilities  in India are sited,  designed,   safety review, verification of compliance through safety
        constructed, commissioned and operated in accordance   reviews and inspections during various stages viz. siting,
        with strict quality and safety standards. Though prime   construction, commissioning, operation etc.
        responsibility  of safety lies with utility, Atomic Energy   All nuclear facilities undergo an elaborate and in-
        Regulatory Board  (AERB)  oversees the safety of the   depth safety review during various stages. The objective
        nuclear and radiation facilities and has been mandated   of safety review and assessment at various consenting
        to  frame safety  policies, lay down safety  standards
                                                              stages is illustrated below:







                                             to ensure that the chosen site meets Site Evaluation Criteria and is
                    Siting               suitable for the proposed type and capacity of plant from environmental
                                         considerations





                                            to ensure that the proposed plant design meet regulatory requirements,
                Construction            and the proposed construction meets quality requirements





                                            to ensure that the commissioning  programme  and  procedures meet
                                        regulatory requirements; performance of the plant is as per design intent;
               Commissioning            results of commissioing tests  confirm adequacy of the plant design for
                                        operation; and safety analysis for as-built facility has been carried out





                                            to ensure that plant operational limits & conditions meet regulatory
                                        requirements; adequate level of safety is maintained by proper operational &
                  Operation             maintenance procedures & administrative control; organisational structure,
                                        training & qualification of operating personnel meet the requirements and
                                        conditions for renewal of consent as prescribed by AERB