Core Catcher Erection in KKNPP-3               Liner Erection Works  in Reactor Building of KKNPP-4


            Design Basis Report (DBR) on system for retention  received at PFBR and are now stored in FB. This area
        and cooling of molten core (core catcher) was  also  is under  access control and area surveillance  as well
        reviewed along with NPCIL request for erection of core  as monitoring of contamination, air activity and stack
        catcher of KKNPP-3&4. Based on satisfactory review it  activity are being periodically done. Releases reported
        was concluded that there is no hold for erection of the  are below detection limit (BDL).
        core catcher.
                                                                  Decoupling and recoupling of Large Rotatable Plug
            Reports  on geological  mapping,  confirmatory  (LRP) bearing is planned for investigation of high torque
        geotechnical  investigations,  analysis  and  design  of  observed during trial rotation of LRP.  As  preparatory
        essential loads pump  house (UQC) building  structure  work for the investigation,  main  vessel preheating
        and  construction  related  documents  were reviewed  system has been shut down for cooling the main vessel
        towards compliance to the stipulations and NPCIL was  and both the secondary sodium loops are completely
        permitted to take up the construction of UQC.         drained.  AERB Site Observers Team (SOT) deputed
                                                              at Kalpakkam Site has been independently  observing
            AERB carried out review of design adequacy checks   ongoing commissioning activities at PFBR with respect
        for critical locations in civil engineering  structures   to regulatory safety aspects.
        following AERB safety  standards and concrete mix
        designs for normal and heavy concrete.

        (ii) Kudankulam Nuclear Power Project  - 5&6
            (KKNPP- 5&6)

            NPCIL application for  FPC  along with  relevant
        PSAR Chapters are under review with major focus on
        design differences w.r.t. KKNPP-3&4.
        A.2 Fast Breeder Reactors Based NPPs

        (i) Prototype Fast Breeder Reactor (PFBR)

            Clearance for receipt, handling and storage of 42
        numbers  of fresh fuel  sub-assemblies  (FSA)  at Fuel
        Building  (FB) was issued on June  28, 2019  after
        detailed safety review and assessment of the application                PFBR BHAVINI Site
        along with the supporting documents. FSAs have been