1.8.2 Significant Events related to Industrial        and Fire Safety (I&FS) aspects as identified by NPCIL

                 Safety                                          committees and effective safety supervision by NPCIL.
                                                                    These    incidents   and   NPCIL     submissions
               Significant events reported to AERB were reviewed   were reviewed in  detail  by AERB  wherein  certain
           in  detail  and  measures to prevent  the recurrence  of   recommendations  were made. NPCIL identified
           such incidences  were recommended.  The  analyses     measures required  to strengthen  OHS in  nuclear
           and recommendations of the accident were forwarded    projects. The compliance  for implementation  was
           to all units of DAE for information and lessons to be   periodically  verified by SOT at Site and was  also
           learnt from these incidents. A brief description of events,   verified in subsequent RI of KKNPP-3&4. Considering
           associated  review  and  recommendations/directives of   the actions initiated to enhance safety and sample check
           AERB is given below.
                                                                 during regulatory inspection, the construction activities
           (a) Kudankulam       Nuclear     Power      Project   in the areas where accidents had occurred at KKNPP-3
               (KKNPP-3 to 6)                                    to 6 were allowed to be resumed on July 03, 2019.
               On April  15,  2019,  a fatal accident took place at   (c) Rajasthan Atomic Power Project (RAPP-7&8)
           the temporary dyke area of KKNPP-3 to 6. The victim      Work of erection of “I” sections Girders for mounting
           employed by contractor engaged in the repair work of   of EOT crane track in mechanical workshop of RAPP-
           an excavator along with the operator, fell down from a   7&8 was being carried out by Contractor. On August
           height of around 2.5 m. He was immediately shifted to   13, 2019 for shifting of a girder from fabrication shop
           the first-aid centre of the contractor and subsequently   to work area, a group of 7 workers led by foremen were
           to hospital at Nagercoil. The victim succumbed to his   working. The girder was being shifted by rolling it on
           injuries on April 16, 2019.
                                                                 pipe  pieces  as a roller  and  pushing  with the  crowbar
           (b) Kudankulam       Nuclear     Power      Project   from backside. During  the  process, the girder  slipped
               (KKNPP-3&4)                                       from pipes & toppled on its right side. Seeing this, other
                                                                 worker on right side moved away safely, while the victim
               On April  28,  2019,  an accident of serious nature  slipped and his right leg received injury as he was caught
           occurred at Fabrication Shop # 2 in the infrastructure  in between the girder and floor. He succumbed to the
           area of KKNPP-3&4. Left hand  of the victim (an  injuries on September 19, 2019 during the treatment at
           operator with the contractor) got entangled in a drilling  hospital.
           machine while cleaning the drilling chips. The left hand
           was severed nearly from the middle of the forearm. The   Root cause of the accident was use of hazardous
           victim was given  first-aid in the ambulance  and  was   methodology  of material handling  and contributory
           immediately shifted to Hospital at Nagercoil.         causes  were  inadequate  supervisory  oversight from
                                                                 senior engineers  of Contractor  and unavailability  of
               AERB stopped all construction activities at KKNPP-3  job-specific Safe Work Permit and Job Hazard Analysis
           to 6. AERB recommended  NPCIL for conducting  (JHA). NPCIL was asked to develop job-specific JHAs
           general  review  of safety management  systems at all  after design detailing and engineering taking cognizance
           NPCIL sites with specific attention to recent events and  of field constraints, development of a better methodology
           associated  factors. In response,  NPCIL submitted  the  for transportation of girder from the fabrication to
           proposed corrective and safety enhancement measures  erection  location,  strengthening  training  programme
           to strengthen Occupational Health Safety (OHS)  and competency evaluation method for workers, tool-
           System at their Stations and Projects. Considering the  box talk prior  to job commencement,  strengthening
           actions for enhance  safety by NPCIL, AERB  granted  competency of line management personnel in Health &
           permission to resume the construction  activities of  Safety aspects etc. The responses from RAPP-7&8 Site
           KKNPP-3 to 6 (except for areas where accidents had  would  be checked  during  RI for verification  of stated
           occurred) on May 1, 2019 subject to implementation of  corrective & preventive actions.
           corrective measures towards enhancement of Industrial








            34 AERB Annual Report 2019