Page 14 - AERB Bulletin English
P. 14

Nuclear Power Projects-Construction

          Pressurized Heavy Water Reactor (PHWR)




            Twin units of indigenously designed 700 MWe PHWRs are being set up each at Kakrapar (KAPP-3&4),
            Rawatbhata (RAPP-7&8) and Gorakhpur (GHAVP-1&2) respectively. These reactors are similar in design
            except for site specific changes. Safety review of progressive submissions are in progress.


          Civil  construction and  erection of equipment/     •  RAPP-7: Inner Containment  Dome Concreting
          components  are  under  progress  at KAPP-4  and        and Pre-stressing activities have been completed.
          RAPP-7&8.  Following activities  completed  during
                                                              •  RAPP-8: North &  South SG vault  and IC wall
          the year;
                                                                  construction including  ring beam  has been
          •  KAPP-4: Pre-stressing activity  of Inner
                                                                  completed.
              Containment was completed.
                                                            GHAVP–1&2
                                                            AERB  issued  Siting consent for  4 units of 700  MWe
                                                            PHWRs  at Gorakhpur, Haryana site (GHAVP-1  to  4)
                                                            in 2015. Subsequent to grant  of  excavation consent
                                                            in January 2018,  the excavation activities  being
                                                            commenced for main plant buildings of GHAVP–1&2.
                                                            PSARs of GHAVP-1&2 as required for FPC, have been
                                                            reviewed with a focus on design/layout differences in
                                                            GHAVP w.r.t. KAPP-3&4 and site-specific features.
                    RAPP-7&8 Main Plant Area

















                    Preparation for vertical testing in progress       Head preparation for anchor piles in progress



























                             AERB Team along with Plant Personnel during Commissioning of KAPP-3


         12
                  AERB BULLETIN 2019
                  AERB BULLETIN 2019