          AERB  has established a  regulatory framework,      construction, commissioning and operation etc. All
          which involves stipulating the safety requirements,   nuclear power projects undergo an elaborate and in-
          issuance  of  regulatory  consents,  verification  of   depth safety review during their various consenting
          compliance through safety reviews &  inspections    stages, as illustrated below.
          during various stages from siting,  design,




                       SITING                 To ensure that the chosen site meets Site Evaluation Criteria
                                              and is suitable for the proposed  type and capacity  of plant  from
                                              environmental considerations






                                              To ensure that  the proposed  plant  design meet regulatory
                       CONSTRUCTION           requirements, and the proposed  construction meets quality

                                              requirements




                                              To ensure that the commissioning programme and procedures meet
                       COMMISSIONING          regulatory requirements; performance of the plant is as per design
                                              intent; results of commissioing tests confirm adequacy of the plant
                                              design for operation; and safety analysis for as-built facility has been
                                              carried out

                                              To ensure that plant operational limits & conditions meet regulatory
                                              requirements; adequate level of safety is maintained by proper
                       OPERATION              operational & maintenance procedures & administrative control;
                                              organisational  structure,  training  &  qualification  of  operating
                                              personnel meet the requirements and conditions for renewal of
                                              consent as prescribed by AERB

                      Siting                             Construction                      Commissioning
            •   Jaitapur, Maharashtra                                                 •  Kakrapar, Gujarat
                                         •  Kudankulam, Tamil Nadu 4x1000 MWe PWRs
               6 x 1650 MWe EPR                                                         2x700 MWe PHWRs
           •   Kaiga, Karnataka          •  Gorakhpur, Haryana 4x700 MWe PHWRs        •  Kalpakkam, Tamil Nadu
              2 x 700 MWe PHWRs          •  Rawatbhata, Rajasthan 2x700 MWe PHWRs       1x 500 MWe PFBR