process. Subsequently, industrial scale facility for   authorized/ re-authorized.
                  sodium metal production will be constructed.
                                                               (ii)    Licensing committee of Zirconium Complex
                      Accordingly,  HWP-Baroda  submitted  an       met once and 5 operation personnel (Shift In-
                  application  for  Siting  &  Construction  of  24  kA   charge) were authorized/re-authorized.
                  Sodium  cell  along  with  supporting  documents
                  like Site Evaluation Report (SER), Safety Report,   1.5     OVERALL SAFETY PERFORMANCE OF
                  Construction  Schedule,  Job  Hazard  Analysis    NUCLEAR FACILITIES
                  (JHA)  report  and  QA  Manual  for  construction.
                  The application was reviewed in AERB following   1.5.1   Safety  Performance  of  Nuclear  Facilities
                  multi-tier review process. Based on safety review,   in Construction Stage
                  AERB  accorded  the  consent  for  'Siting  and
                  Construction' for setting up the 24kA Prototype   (a)      KKNPP–3 to 6
                  Sodium Cell at Heavy Water Plant, Baroda.
                                                                     Construction  activities  are  in  progress  at
                  (v)     Atomic    Minerals    Directorate    for   KKNPP-3 to 6 site. There was one fatal accident in
                      Exploration  and  Research  (AMD)        the  sea  front  and  one  fatality  following  an
                                                               accident of serious nature at pump house area of
                      Exploration work at various sites of AMD in   KKNPP-3&4. AERB reviewed these accidents and
                  northern, southern, eastern, western, central and   measures to prevent recurrences of such incidents
                  south-central  region  was  in  progress.  No   in future were recommended and conveyed to the
                  regulatory  inspection  of  AMD  facilities  was   site  for  compliance.  Further  details  are  given
                  carried out during the year.                 under section 1.8.2.

                  (vi)    Beach Sand Minerals (BSM) & Naturally   (b)     PFBR
                      Occurring Radioactive Materials (NORM)
                      Facilities                                    Pre-commissioning/commissioning
                                                               activities at PFBR are in progress. There was no
                      Periodic radiological reports submitted by   major reportable  incident  at  PFBR  calling  for
                  the  facilities  were  reviewed  by  AERB.  No   enforcement actions during the period.
                  abnormality was observed during review.
                                                               (c)    KAPP-3&4,  RAPP-7&8  and GHAVP-1&2
                  1.4.4  Licensing of Plant Personnel in FCF
                                                                    Construction  activities  are  in  progress  at
                      Operating personnel of Fuel Cycle Facilities   KAPP-3&4,  RAPP7&8  and  GHAVP-1&2  sites.
                  are required to go through a rigorous Licensing   There was one reportable injury, one accident of
                  process. This includes clearing checklists, written   serious nature  in  RAPP-7&8  during  erection/
                  exams,  walkthrough  and  nally  qualication   construction  related  activities.  AERB  reviewed
                  interviews.  A  candidate  after  successfully   these  incidents  and  measures  to  prevent
                  completing  the  pre-requisites  of  licensing   recurrences  of  such  incidents  in  future  were
                  procedure,  appears  before  the  licensing   recommended  and  conveyed  to  the  site  for
                  committee  for  qualication  interview.  This   compliance.
                  committee  has  member(s)  from  AERB.  On
                  satisfactory  performance,  the  candidate  is   (d)     Kaiga-5&6
                  authorization/re-authorization  for  the  given
                  position.                                    There was no major reportable incident calling for
                                                               enforcement action at Kaiga-5&6.
                      During the year total 4 meetings were held
                  for  authorization/re-authorization  of  operating   (e)     DFRP and FRFCF
                  personnel  from  HWPs  &  ZC,  and  total  of  42
                  candidates  were  authorized/re-authorized,  as           Ther was no major reportable incident calling
                  detailed below:                              for  enforcement  action  during  commissioning
                                                               activities at DFRP and construction at FRFCF.
                  (i)     Licensing committee of Heavy Water Plants
                      met  on  3  occasions  and  37  operation   (f)     NFC-Kota
                      personnel  (Shift  In-charge,  Field  Engineer
                      and    Control    Panel    Operator)    were   Construction of the plant buildings is under