Page 6 - eNewsletter_Q1_Eng Jul-Sep 20.cdr
P. 6
4.0 National and International Co-operation
(i) National HealthAgency, MoHFW provides a peer review of both regulatory technical and
policy issues against IAEA Safety Standards. IRRS
AERB has established co-ordination with the National mission also provides an opportunity to exchange
Health Agency (NHA), MoHFW, to participate in the professional experience with experts in the IRRS team.
Government’s mission of an integrated digital health
infrastructure, through National Digital Health Mission AERB hosted the Integrated Regulatory Review Service
(NDHM). In this mission, AERB endeavours to integrate (IRRS) Mission in March 2015 for Nuclear Power Plants
its regulatory process of issuance of Licences through its (NPPs). The IRRS team had identiï¬ed several good
online e-licensing portal (e-LORA), relating to medical practices along with areas of improvement in the form of
radiation facilities in the country. Head, DRA&C, has been recommendations and suggestions. The Government of
nominated as the nodal contact person from AERB for India made the report of the IRRS Mission publicly
further coordination with NHAfor NDHM. available through the website ofAERB.
(ii) Directorate General of Foreign Trade, MoCI India has now invited IAEA for an extended IRRS
Follow-up Mission in India. The scope of the Mission has
AERB participated in Inter-Ministerial Meetings been extended to include radiation sources facilities and
convened by the Director General of Foreign Trade activities. A preparatory meeting was conducted during
(DGFT), MoCI for technical review of applications for July 21 - 23, 2020 in virtual mode due to the global COVID-
approval / renewal of ‘Recognition’ issued by DGFT in 19 pandemic situation. The terms of reference for the
respect of Pre-Shipment InspectionAgencies (PSIA). extended follow-up mission were ï¬nalized during the
preparatory meeting. The meeting was attended by team
(iii) Preparatory Meeting of IRRS follow-up leader from Canada, and deputy team leader from USA and
mission IAEA Coordinator, senior management of AERB and
representative of Department ofAtomic Energy (DAE).
The International Atomic Energy Agency (IAEA) has
established ‘Integrated Regulatory Review Service’ The follow-up mission scheduled in January 2021 is
(IRRS) to enhance the effectiveness of the national provisionally rescheduled by IAEA to June 2021 due to the
regulatory infrastructures for safety. The IRRS mission situation arising from COVID-19 pandemic.
provides a peer evaluation of the host country’s regulatory
infrastructures in nuclear and radiation safety in civilian
use of atomic energy. The IRRS regulatory review process
IAEA IRRS Preparatory meeting through Video conferencing
6 Vol. 31, No.3, JULY-SEPTEMBER 2020